48% of U.S. construction rework was linked to poor communication and project data in a PlanGrid/FMI study. Here’s how reviewing electrical plans can help you avoid such costly mistakes.

Key takeaways

  • Electrical plans may contain assumptions that haven’t been checked on-site.
  • Poor coordination can lead to change orders, delays, and rework.
  • Reviewing drawings early helps you avoid expensive construction changes later.
  • Checking equipment, capacity, and responsibilities can reveal unresolved project risks.
  • Experienced electrical contractors can identify issues before construction work begins.

Have you ever reviewed your electrical plans and wondered whether everything shown will actually work on-site? It’s a fair question, especially when you’re managing a tenant improvement project and relying on drawings prepared before every building condition has been confirmed.

Chances are that the existing panel can’t support your new equipment, the electrical layout conflicts with the ceiling design, or nobody has confirmed who’s responsible for a particular installation. Unfortunately, these problems often become apparent after construction begins, when correcting them can affect your budget and schedule.

Reviewing a commercial electrical plan example helps you identify those gaps earlier. A proper review compares the drawings with existing building conditions, checks equipment and load requirements, and confirms that electrical work has been coordinated with other trades.

It also identifies decisions that need clarification from the design team before purchasing or installation begins.

Here’s what you should check before approving the electrical scope.

A Complete-Looking Electrical Plan Isn’t Necessarily a Buildable Plan

Getting your electrical drawings approved for permitting doesn’t necessarily mean every construction detail has been resolved. Your plans still need to reflect the building’s actual electrical capacity, available installation space, and existing equipment.

So, how do you read an electrical plan? Start with the symbols and legend, then review the lighting and power layouts, panel schedules, equipment details, and one-line diagrams. Compare what those drawings specify with what your tenant improvement project actually requires.

Pay particular attention to:

  • Electrical service: Is enough capacity available for your proposed tenant loads?
  • Existing equipment: Do the panels, feeders, and breakers match the drawings?
  • Equipment locations: Is there enough space for installation and maintenance?
  • Electrical pathways: Can conduits and feeders follow the proposed routes?
  • Building records: Have previous renovations changed the original installation?

Older drawings can help you understand the building’s electrical system, but they may not reflect years of modifications. If you’re uncertain about equipment condition or available capacity, an electrical safety audit can help identify areas that require further investigation.

Coordination Gaps Can Become Change Orders, Delays, and Rework

Your electrical drawings need to agree with the architectural, mechanical, plumbing, life-safety, and vendor plans. Otherwise, you could approve an electrical layout that creates installation conflicts once different contractors begin working.

Common problems include:

  • Electrical requirements that don’t match updated equipment schedules.
  • Lighting and outlets that conflict with ceilings, furniture, or millwork.
  • Equipment that won’t fit in the space shown on the drawings.
  • Conduit routes and penetrations that haven’t been coordinated.
  • Installation responsibilities that haven’t been assigned.

Those last details deserve attention. If a drawing says “by others” or “field verify,” you need to know who is responsible and when the question will be resolved. Otherwise, everyone may assume someone else is handling it.

The cost of poor coordination is substantial. According to the PlanGrid and FMI research, 48% of rework on U.S. construction jobsites was attributed to poor communication and project information in its 2018 analysis. Although that figure covers construction generally, it shows why unresolved drawing conflicts deserve attention before crews begin work.

For tenant improvement projects, reviewing the electrical scope alongside other trades can help identify conflicting requirements before they become RFIs, delayed purchases, or change orders. Contractors familiar with commercial electrical services can also help flag installation concerns that need clarification from the design team.

The Best Time to Challenge an Expensive Decision Is Before It Becomes Work

Have you ever seen a project detail that looked reasonable on a drawing but made little sense once someone checked the actual installation? That’s exactly the kind of issue a constructability review should catch.

For example, a load calculation may be based on outdated building information, or a specified panel may not fit where the drawings show it. Your electrical contractor shouldn’t independently redesign the engineer’s work, but should raise those concerns and request clarification before installation.

Timing makes a difference. Changing an equipment location on a drawing is usually easier than changing it after materials arrive, walls are completed, or feeders are installed.

The financial impact is well documented. An Autodesk construction article cites research indicating that up to 70% of construction and engineering rework can be design-induced. That estimate covers the wider construction industry, but it reinforces why design questions should be resolved early.

Before purchasing equipment or beginning affected work, keep a record of unresolved questions, assign responsibility, and confirm the answers with the appropriate design professionals. That way, you’re not discovering the project’s electrical requirements through a series of change orders.

Key Questions to Ask Before Work Begins

Before approving your electrical scope, make sure your team can answer these questions:

  1. Have you verified existing conditions? Check whether the drawings reflect the building’s installed electrical system.
  2. Do the tenant loads match the plans? Confirm that the latest equipment selections and electrical requirements are included.
  3. Are the drawings coordinated? Compare electrical layouts with current architectural, mechanical, plumbing, and vendor information.
  4. Does everyone know their responsibilities? Clarify work assigned to the landlord, tenant, vendors, and contractors.
  5. Are important decisions still unresolved? Identify questions that could become expensive after procurement or construction begins.

If you can’t answer some of these questions, you may need another review before approving the affected work. Resolving them early helps you make purchasing and scheduling decisions using accurate information.

Protect Your Project with a UES Electrical Plan Review

A commercial electrical plan example can reveal unresolved assumptions about existing conditions, available capacity, equipment selections, installation space, and responsibilities. 

Reviewing those details before construction helps your team identify problems while corrections can still be made through the design process.

However, identifying a problem doesn’t automatically resolve it. You still need to verify the information, coordinate with the relevant trades, obtain design clarifications, and decide what must be addressed before purchasing or installation.

UES can help you work through those electrical scope concerns before they affect your project. Our team can review the plans against available building information, identify potential installation conflicts, and help flag capacity, equipment, and coordination questions for the design team. We can also help you prioritize the issues that need answers before construction proceeds.

Planning a tenant improvement project? Contact UES to review your electrical scope before unresolved decisions become expensive construction changes.